Groundwater Development (GWD)for Gerema PA, SNNP, Halaba special wereda  (Drilling & Construction supervision)

Study time (project duration):- 30-days, January-2018

Description:-  Gerema PA Groundwater development (water well Drilling supervision)

  • Summarized Drilling History of Gerema well
  • UTM Location: UTME 0393657 E and 0815873 N
  • Mobilization to site 14/11/17
  • Drilling was started on                               16/11/17
  • Drilling was completed on                              27/11/2017
  • Date of well completion 03/12/17
  • Drilling technique Mud rotary
  • Drilling diameter                      12’’ and 10’’
  • Total depth drilled                 217m
  • Static water level                                5m
  • Discharge 6 l/sec
  • Total drawdown 33m
  • Pump test duration 8-hour
  • Type and diameter of production casing      6 inch,    steel type
  • Grouting depth                          6m
  • Gravel pack 10m3
  • Well development time 8 hours
  • Well head & metal sheet cover is constructed

Leave a Comment

Your email address will not be published. Required fields are marked *