Description:- Chilanko 2-community, Badore-2 & Epar 2-community Groundwater development (water well Drilling supervision)
- of wells
- Chilanko 2-wells:-
- Drilling technique DTH
- Drilling diameter 12’’ and 110’’
- Total depth drilled 40m
- Estimated discharge 0.8 l/sec
- Type and diameter of production casing 6 inch, uPVC type
- Epar 1-well:-
- Drilling technique DTH
- Drilling diameter 12’’ and 110’’
- Total depth drilled 49m
- Estimated discharge 0.4 l/sec
- Type and diameter of production casing 6 inch, uPVC type
- Badore 2-wells:-
- Drilling technique DTH
- Drilling diameter 12’’ and 110’’
- Total depth drilled 21_26m
- Estimated discharge 1.0 l/sec
- Type and diameter of production casing 6 inch, uPVC type
- Epar 1-well:-
- Drilling technique DTH
- Drilling diameter 12’’ and 110’’
- Total depth drilled 92m
- Estimated discharge 1.5 l/sec

